Bathroom pods · Structure: Steel

Steel-frame bathroom pods CUBIK® Steel

A complete bathroom pod built with galvanised steel profiles, fibre-gypsum boards and a concrete floor slab. A lighter system that accepts any project geometry.

CUBIK® Steel: Galvanised steel profiles, Fibre-gypsum board, Services in the cavity, Concrete floor slab. Illustrative diagram, not to scale.

Galvanised steel profiles

Fibre-gypsum board

Services in the cavity

Concrete floor slab

Illustrative diagram, not to scale

Structure

Galvanised steel in the structure, not in the finishes

Steel refers to the structure. CUBIK® Steel combines a frame of galvanised steel profiles, fibre-gypsum board linings and a concrete floor slab. Services run through the cavity between boards. The interior finish is specified separately; if the project requires it, it may include stainless steel surfaces, but that is a finishing choice, not a structural one.

Galvanised steel profiles
Structural frame of the walls.
Fibre-gypsum board
Lining on both sides of the frame.
Services in the cavity
Pipework and cabling between boards.
Concrete floor slab
Base of the pod.

Anatomy of the pod

What goes into a CUBIK® Steel bathroom pod

Structure
Anatomy of a pod Base: The pod's floor slab or base, which carries the whole assembly. Structure: The chosen CUBIK system defines the structural material of the pod. Services: Water supply, drainage, electrics and ventilation, ready to connect to the building. Finishes: Wall and floor finishes to the project specification. Fittings: Shower tray, WC, basin, vanity unit, mirror and specified accessories. Ceiling: The top of the pod, with whatever access panels the project requires. Illustrative diagram, not to scale

Anatomy of a pod

CUBIK® Steel

  • Geometric freedom

    The profile frame adapts the pod to any geometry the project requires.

  • Lower weight

    A lightweight system that eases transport, lifting and integration into structures with lower load capacity.

  • Services coordinated in design

    Services are routed through the cavity between boards, coordinated in the pod's 3D model.

  • Concrete base

    The concrete floor slab provides a rigid base for the floor and the shower tray.

What is included

  • Galvanised steel profile structure with fibre-gypsum board lining.
  • Concrete floor slab.
  • Plumbing, drainage and electrical services.
  • Wall and floor finishes.
  • Specified sanitaryware, taps, furniture and accessories.
  • Preparation for connection to the building's water, electrical and ventilation networks.

What depends on the project

  • Geometry, dimensions and layout of each pod type.
  • Interior finishes, including any stainless steel surfaces.
  • Regulatory requirements of the destination country (fire, acoustics, accessibility).
  • Connection points and type of connection to the building services.
  • Delivery sequence and scope of installation on site.

What to allow for in the building

As a lightweight system, CUBIK Steel suits refurbishments and structures with load limitations. The opening, slab bearing, service routes and connection points are coordinated with the design team at design stage.

Compare CUBIK systems

Compare CUBIK systems
StructureCUBIK® ConcreteCUBIK® SteelCUBIK® Wood
StructureMonolithic reinforced concrete · Integrated services · Interior finish · Concrete baseGalvanised steel profiles · Fibre-gypsum board · Services in the cavity · Concrete floor slabTimber structure · Interior finish · Base to suit project
Compare CUBIK systems

Frequently asked questions

Is a CUBIK Steel bathroom a stainless steel bathroom?

Not necessarily. Steel describes the structure, made of galvanised steel profiles with fibre-gypsum boards and a concrete floor slab. Interior finishes are chosen for each project and may be ceramic or other materials.

When should I choose Steel over Concrete?

When the project calls for specific geometries or when the weight of the pod constrains the structure or the logistics. We assess this in each project's technical study.

Can I get weight, dimension or acoustic performance data?

Yes. These values depend on each pod type and are provided in the technical study, together with the documentation required by the destination country's regulations.

Review my project with CUBIK® Steel

Tell us about the project. An engineer will review the information and propose the next steps.