Technical resources

Practical information for specifiers, contractors and developers considering off-site bathrooms and kitchens for a project.

Comparison

Concrete, Steel and Wood side by side

A qualitative comparison based on the description of each system. Weights, dimensions and regulatory performance depend on each pod type and are provided in the technical study.

Concrete, Steel and Wood side by side
Criterion
CUBIK® Concrete
CUBIK® Steel
CUBIK® Wood
Illustrative diagram, not to scale
CUBIK® Concrete: Monolithic reinforced concrete, Integrated services, Interior finish, Concrete base. .

Monolithic reinforced concrete

Integrated services

Interior finish

Concrete base

CUBIK® Steel: Galvanised steel profiles, Fibre-gypsum board, Services in the cavity, Concrete floor slab. .

Galvanised steel profiles

Fibre-gypsum board

Services in the cavity

Concrete floor slab

CUBIK® Wood: Timber structure, Interior finish, Base to suit project. .

Timber structure

Interior finish

Base to suit project

Structure Monolithic reinforced concreteGalvanised steel profilesTimber structure
Pod base Concrete, monolithic with the wallsConcrete floor slabSet in the technical study
Services Integrated in the structureIn the cavity between boardsDefined in the project
Geometry Per pod typeAccepts any geometryPer pod type
Relative weight Heaviest of the threeLightweight systemSet in the technical study
Interior finishes Defined per project, independent of the systemDefined per project, independent of the systemDefined per project, independent of the system
Read more

Guide

How to prepare drawings for a bathroom pod project

With this information we can assess the pod's feasibility and prepare a proposal without back and forth.

  1. Dimensioned plan of each type

    Internal dimensions, position of door, shower or bath, WC, basin and accessories.

  2. Sections and heights

    Clear internal height, available slab and ceiling void depth and levels of service routes.

  3. Connection points

    Planned position of the building's water, drainage, electrical and ventilation connections.

  4. Finish standard

    Finishes, sanitaryware, taps and accessories, or the interior design reference that defines them.

  5. Number of units

    Approximate quantity per type and variants (accessible, mirrored).

  6. Access and logistics

    Site access, planned lifting equipment and installation sequence.

  7. Regulations

    Destination country and specific requirements (fire, acoustics, accessibility, healthcare).

  8. Programme

    Date the pods are needed on site and project stages.

Documentation

Technical data sheets and BIM models

Technical documentation for each system and models of the pod types are prepared for each project. Request them stating the system and intended use.

Frequently asked questions

I am an architect. When should the system be decided?

Ideally at concept or scheme design, when openings, heights and service routes can still be adapted to the pod.

I am a contractor. What changes in the site programme?

Bathrooms stop being a sequence of trades on each floor and become a supply package with a delivery date, which is placed and connected.

I am a developer. When is the cost fixed?

We work to a fixed price, agreed before manufacturing on the basis of the defined project.

I am a hotel operator. Can I approve a prototype?

Approval of pod types before series production is agreed project by project. Ask us how it fits your programme.

Documentation

Request the technical documentation for your project

Tell us the system and the type of project and we will send you the available information.